Geotechnical grille manufacturers tell you the construction process of the geotechnical grille
The construction process of the earthwork grid is the process of the construction process:
Inspection, cleaning up bearing layer, artificial paving geotechnical grille, lap, lashing, securing, stand upper layer of subgrade soil compaction, detection.
Geogrid according to width of the design requirements of laying in flat lower bearing layer, the lower filler to ensure the unarmed bad geotechnical grille debris, laying geogrid, the high strength of the vertical in the axial direction of embankment arrangement. Geogrid transverse laying, laying taut, stretched, avoid wrinkle, twist or potholes. Geotechnical grille along the longitudinal splicing by overlapping method, lap width of not less than 20cm.
Shop good geogrid, artificial laying upper filling, rolling is completed timely, to avoid long-term exposure, and then the mechanical transport material, leveling, compaction, paving machine, rolling from both sides to intermediate to advance, rolling from both sides to the middle of and the degree of compaction of keep meet the requirements of the specification.
All construction vehicles and machinery are prohibited from driving or parking on the paved geogrid and construction at any time to check the quality of Geogrid and discover a wreck, puncture, tear and damage, depending on the degree of repair or replacement.